Evaluation of the gold (Au) reserves in the alluvial terraces of the San Vicente sector

dc.creatorMejía Flores, Marco Antonio
dc.creatorGranja Carrera, Jenny Priscila
dc.creatorTsenkush Chamik, Faustino Ampam
dc.date2021-07-05
dc.date.accessioned2024-04-29T17:00:18Z
dc.date.available2024-04-29T17:00:18Z
dc.identifierhttps://cienciadigital.org/revistacienciadigital2/index.php/ConcienciaDigital/article/view/1766
dc.identifier10.33262/concienciadigital.v4i3.1766
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/9253690
dc.descriptionIntroducción: En la región amazónica del Ecuador, se tienen yacimientos de oro aluvial que son extraídos por comunidades locales. bajo la modalidad de permiso de minería artesanal, otorgado por el Estado Ecuatoriano; como es el caso del sector San Vicente, parroquia Patuca, en Morona Santiago. La extracción lo realizan de forma empírica sin un estudio técnico previo. Por tal motivo, el trabajo de campo incluye la prospección de un área de 41.7 ha, se hizo un modelo determinando con las áreas con mineralización positiva a utilizar y finalmente se propone un método de explotación. Objetivo. Realizar la evaluación de las reservas de oro (Au) en las terrazas eluviales del Sector San Vicente, mediante un análisis técnico con el fin de adoptar sistemas de explotación acorde a las características geológicas, mineralógicas y la cantidad y calidad del mineral existente en el depósito eluvial. Metodología, consistió en muestreo, lavado y concentrado de materiales eluviales; con una batea y el material concentrado de 10 kilos, para detectar la presencia de minerales como el oro (Au); según el procedimiento de la tabla de colores. Resultados: •En la terraza aluvial se establece el cálculo de volumen por el método de perfiles de estratos mineralizados de alta concentración en 159.461,98 m3 con un tenor de 0.56 gr/m3 y reservas de 89.298,70 gramos de oro, mediana concentración 100.486,86 m3 con un tenor de 0.085 gr/m3 y reservas de 8.541.38 gramos de oro, baja concentración 29.657.25 m3 con un tenor de 0.016 gr/m3 y reservas de 474.51 gramos de oro, obteniéndose unas reservas probadas totales de 98.314,59 gramos de oro. Conclusión. •El arranque por franjas y arranque por medios hidráulicos es de menor coste de operación que el de franjas y arranque por medios mecánicos, pero con mayor inversión de obras de mitigación y control ambiental.es-ES
dc.descriptionIntroduction: In the Amazon region of Ecuador, there are alluvial gold deposits that are extracted by local communities. under the modality of artisanal mining permit, granted by the Ecuadorian State; as is the case of the San Vicente sector, Patuca parish, in Morona Santiago. The extraction is carried out empirically without a prior technical study. For this reason, the field work includes the prospecting of an area of ​​41.7 ha, a model was made determining with the areas with positive mineralization to be used and finally a method of exploitation is proposed. Objective. Carry out the evaluation of the gold (Au) reserves in the eluvial terraces of the San Vicente Sector, through a technical analysis in order to adopt exploitation systems according to the geological and mineralogical characteristics and the quantity and quality of the mineral existing in the deposit. eluvial. Methodology, consisted of sampling, washing and concentrating of eluvial materials; with a pan and the 10 kg concentrated material, to detect the presence of minerals such as gold (Au); according to the color chart procedure. Results: • In the alluvial terrace, the volume calculation is established by the method of profiles of high concentration mineralized strata in 159,461.98 m3 with a content of 0.56 gr / m3 and reserves of 89,298.70 grams of gold, medium concentration 100,486 , 86 m3 with a content of 0.085 gr / m3 and reserves of 8,541.38 grams of gold, low concentration 29,657.25 m3 with a content of 0.016 gr / m3 and reserves of 474.51 grams of gold, obtaining total proven reserves of 98,314 , 59 grams of gold. Conclution. • Strip start-up and hydraulic start-up have a lower operating cost than strip and mechanical start-up, but with greater investment in mitigation and environmental control works.en-US
dc.formatapplication/pdf
dc.formattext/plain
dc.formatapplication/epub+zip
dc.languagespa
dc.publisherCiencia Digital Editoriales-ES
dc.relationhttps://cienciadigital.org/revistacienciadigital2/index.php/ConcienciaDigital/article/view/1766/4385
dc.relationhttps://cienciadigital.org/revistacienciadigital2/index.php/ConcienciaDigital/article/view/1766/4386
dc.relationhttps://cienciadigital.org/revistacienciadigital2/index.php/ConcienciaDigital/article/view/1766/4409
dc.rightsDerechos de autor 2021 ConcienciaDigitales-ES
dc.sourceConcienciaDigital; Vol. 4 Núm. 3 (2021): Mundo en Pandemia; 94-110es-ES
dc.sourceConcienciaDigital; Vol. 4 No. 3 (2021): World in Pandemic; 94-110en-US
dc.sourceConcienciaDigital; v. 4 n. 3 (2021): Mundo en Pandemia; 94-110pt-BR
dc.source2600-5859
dc.source2600-5859
dc.source10.33262/concienciadigital.v4i3
dc.subjectEluvial terrace; Mineralized strata, Gold reserves, Deposit tenor, Siliceous sand.en-US
dc.subjectTerraza eluvial; Estratos mineralizados, Reservas de oro, Tenor del yacimiento, Arena silícea.es-ES
dc.titleEvaluación de las reservas de oro (Au) en las terrazas aluviales del sector San Vicentees-ES
dc.titleEvaluation of the gold (Au) reserves in the alluvial terraces of the San Vicente sectoren-US
dc.typeinfo:eu-repo/semantics/article
dc.typeinfo:eu-repo/semantics/publishedVersion
dc.typeArtículo revisado por pareses-ES


Este ítem pertenece a la siguiente institución