dc.contributorHéctor Padilla
dc.creatorPerez Castellanos, Diego Pablo
dc.date2023-01-05T18:51:03Z
dc.date2023-01-05T18:51:03Z
dc.date2019
dc.dateAgosto-2019
dc.date.accessioned2023-11-07T20:53:03Z
dc.date.available2023-11-07T20:53:03Z
dc.identifierhttps://repositorio.unitec.edu/xmlui/handle/123456789/10281
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/9219962
dc.descriptionDurante las 13 semanas que se estuvo realizando la prácticaprofesional, en la empresa García& GarcíaCompañía y Servicios S. A.(GGCC)se tomóel trabajo de Ingeniero Residente en los proyectos que estaba realizando la empresa. Durante este tiempo la empresa ejecutovarios proyectos como ser:Nave industrial.Plaza comercial Remodelaciónen la Farmacia Siman.Pavimentación de un autoservicio.Cada uno de los proyectos anteriores era un desafío diferente, y ocupaba una gran cantidad de conocimiento, en cada uno se hicieron actividades diferentes:en la nave se realizóun relleno y compactado de 2 mts de alto, en la Siman se realizóuna remodelación total del piso se tuvieron que mover baños y circuitos, en la plaza comercial se elaborabanplanillade pagos,en la cual se realizan estimaciones del trabajo realizado durante la semana.Se trabajócon rendimientos de los materiales de construcciones, sacar cantidades de obra en estructura metálica y obra gris, se aprendió el calculóde horómetro de la maquinaria y de llevar un control de calidad de las actividades.
dc.descriptionDuring the 13 weeks that the internship was carried out in the company García& GarcíaCompañía y Servicios S. A. (GGCC), the work of Resident Engineer in the projects that the company was carrying out was taken on. During this time the company executed several projects such as: industrial building, commercial plaza, remodeling of the Siman Pharmacy, paving of a self-service store, each of the above projects was a different challenge and required a great amount of knowledge, in each one different activities were performed: in the industrial building a filling and compacting of 2 meters high was performed, in the Siman a total remodeling of the floor was performed, bathrooms and circuits had to be moved, in the commercial plaza payment schedules were made, in which estimates of the work performed during the week were made. We worked with the yields of construction materials, taking quantities of work in metallic structure and gray work, we learned how to calculate the hour meter of the machinery and to keep a quality control of the activities.
dc.formatPDF
dc.formatapplication/pdf
dc.languageEspañol
dc.languagees-HN
dc.publisherUniversidad Tecnológica Centroaméricana UNITEC
dc.rightsAtribución-NoComercial-SinDerivadas 4.0 Internacional
dc.rightshttps://creativecommons.org/licenses/by-nc-nd/4.0/deed.es
dc.sourceUniversidad Tecnológica Centroaméricana UNITEC
dc.subjectCompañía
dc.subjectConocimiento
dc.subjectPlanilla
dc.titlePlaza comercial en el centro de choloma, construcción de una nave industrial y remodelación de la farmacia siman
dc.typePráctica Profesional
dc.coverageSan Pedro Sula, Cortés, Honduras.