dc.contributorHéctor Padilla
dc.creatorNavarro Mendez, David Eliseo
dc.date2022-12-14T23:08:23Z
dc.date2022-12-14T23:08:23Z
dc.dateSeptiembre-2019
dc.date2019
dc.date.accessioned2023-11-07T20:52:06Z
dc.date.available2023-11-07T20:52:06Z
dc.identifierDQ_55
dc.identifierhttps://repositorio.unitec.edu.hn//xmlui/handle/123456789/1737
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/9219537
dc.descriptionDurante el tiempo establecido como practicante en el proyecto de pavimentación del bulevar Mackayllevado a cabo por la constructora William y Molina y supervisado por Saybe y AsociadosS de R.L, se aprovechóen gran manera el conocimiento brindado por los ingenieros y obreros de campo que estuvieron involucrados en el proyecto. De igual manera el conocimiento adquirido fue proporcional a las actividades realizadas en apoyo al ingeniero encargado de supervisión junto a los asistentes de oficina y al inspector en campo asignado a llevar el control y seguimiento de las obras realizadas. También se apoyó en la redacción de reportes de diferentes actividades. Una de las actividades que tomó máscompromiso fue en las fundiciones que tenían una duración de hasta 8 horas, supervisando e inspeccionando que el concreto llegara a su temperatura correcto y conun revenimiento dentro del rango establecido. Todas estas mediciones fueron utilizadas la redacción de informes que se presentaban semanalmente como avance del proyecto. Así mismo, se apoyóen el seguimiento de la actividad del taladro encargado de la demolición de rocas, ya que este estaba dentro de administración delegada.||During the time spent as an intern in the Mackay Boulevard paving project carried out by William y Molina construction company and supervised by Saybe y Asociados S de R.L, I took advantage of the knowledge provided by the engineers and field workers involved in the project. Likewise, the knowledge acquired was proportional to the activities carried out in support of the engineer in charge of supervision together with the office assistants and the field inspector assigned to control and follow up the works carried out. He also provided support in the drafting of reports on different activities. One of the activities that took more commitment was in the foundries that had a duration of up to 8 hours, supervising and inspecting that the concrete reached its correct temperature and with a slump within the established range. All these measurements were used in the drafting of reports that were presented weekly as progress of the project. Likewise, support was provided in the follow-up of the activity of the drill in charge of the demolition of rocks, since this was within the delegated administration.
dc.formatPDF
dc.formatapplication/pdf
dc.languageEspañol
dc.languagees-HN
dc.publisherUniversidad Tecnológica Centroaméricana UNITEC
dc.rightshttps://creativecommons.org/licenses/by-nc-nd/4.0/deed.es
dc.sourceUniversidad Tecnológica Centroaméricana UNITEC
dc.subjectWilliam y Molina||Pavimentación||Obras
dc.titlePavimentación trocha oeste del bulevar mackay, San Pedro Sula, Cortés, Honduras
dc.typePráctica Profesional
dc.coverageSan Pedro Sula, Cortés, Honduras.


Este ítem pertenece a la siguiente institución