Práctica Profesional
Unitexa nave industrial y torre de 5 niveles y ampliación mall las américas
Autor
Pinto Santos, John Sevasthian
Resumen
El presente trabajo de pregrado explica el desarrollo de la práctica profesional que se tuvocon la empresa de Construcción “ALANZA”, en la cual se estuvoinvolucrado en dos proyectos, en UNITEXA que consiste en una nave industrial con una torre de 5 niveles y en la Ampliación del Mall Las Américas, ambos proyectos se localizan en Choloma. Primero estuve enUnitexaun mes, asistiendo a los ingenieros de campo con temas de ingeniería civil y seguridad industrial, también ayudé un poco al ingeniero administrativo, apoyaba con cantidades de obras y supervisión de trabajo que hacían varios contratistas, se me asigno unas áreas en particular que era en la torre, en los últimos 2 niveles que eran llamas el 24 y 32 por sus alturas desde el suelo. Apoyaba con detalles que hacían falta ya que la torre estaba totalmente construida y en su mayoría terminaba, pero siempre habían trabajos pequeños que se debían hacer y era donde ayudaba con datos para hacer pedidos de compra o realizar pagos a los contratistas.Luego de un mes en Unitexa, se me solicito moverme a otro proyecto donde ocupaban más ayuda que fue en la Ampliación del Mall Las Américas, que igualmente se encuentra en Choloma, el proyecto cuando llegue estaba en fase de demolición ya que la zona que se va a ampliar y remodelar fue afectada por un incendio y se tuvieron que demoler techos, paredes, losas, etc. Se me asigno ayudar al ingeniero de campo con información diaria de los contratistas con sus obreros y cuantos hombres andan de cada profesión (Albañil, media cuchara, electricista, pintor, techador, etc.). Tambiénapoyaba sacando cantidades de obras para hacer pedidos de materiales y/o para pagarle a los contratistas. También supervisaba el trabajo de los contratistas que se hiciera bien y que no se atrasaran con nada, siempre que podía los apoyaba si ocupaban algo hacia lo que podía para conseguirlo y que pudieran avanzar en su trabajo. También cuidaba de que todos los trabajadores anduvieran su equipo de protección, ya se casco, chaleco, botas, etc.||This undergraduate work explains the development of the professional practice that I had with the construction company°ALANZA", in which I was involved in two projects, in UNITEXA which consists of an industrial building with a tower of 5 levels and in the Expansion of the Mall Las Americas, both projects are located in Choloma. First I was at Unitexa for a month, assisting the field engineers with civil engineering and industrial safety issues, I also helped the administrative engineer a little, I supported with quantities of work and supervision of work done by various contractors, I was assigned to some areas in particular that was in the tower, in the last 2 levels that were called the 24 and 32 because of their heights from the ground. I helped with details that were needed since the tower was fully built and mostly finished, but there were always small jobs that needed to be done and it was where I helped with data to make purchase orders or make payments to contractors. After a month at Unitexa, I was asked to move to another project where they needed more help which was in the Expansion of the Mall Las Americas, also located in Choloma, the project when I arrived was in the demolition phase because the area to be expanded and remodeled was affected by a fire and had to demolish roofs, walls, slabs, etc.. I was assigned to help the field engineer with daily information of the contractors with their workers and how many men were working in each profession (bricklayer, half spoon, electrician, painter, roofer, etc.). He also helped by taking quantities of work to order materials and/or to pay the contractors. He also supervised the work of the contractors so that it was done well and that they did not fall behind with anything, and whenever he could, he supported them if they needed something and did what he could to get it so that they could advance in their work. He also made sure that all the workers were wearing their protective equipment, whether it was a helmet, vest, boots, etc.