dc.descriptionLa presente investigación se realizó con el propósito de presentar los resultados de la prefactibilidad de la instalación de un nuevo sistema de medición de energía en Cementos del Norte S.A. El estudio se realiza como mejora ya que el sistema medición actual es un poco obsoleto y no toma la medición completa de la planta. Se estableció como objetivo principal determinar si es factible técnica y financieramente la instalación de un nuevo sistema de medición energético para Cementos del Norte S.A. La hipótesis es: La instalación de un nuevo sistema medición energética es factible si la TIR es mayor que la TIR mínima del 11% aceptable por Cementos del Norte S.A. para sus proyectos. La metodología utilizada es método cuantitativo, con un tipo estudio no experimental, transeccional, descriptivo, con el estudio técnico y financiero. Las técnicas entrevistas y métodos financieros. Se rechaza la hipótesis nula ya que según el análisis técnico y el análisis de los indicadores financieros donde la TIR nos da 17%, el VAN $40,185.43 y el IR 1.17.
dc.descriptionThis research was carried out with the purpose of presenting the results of the pre-feasibility of the installation of a new energy measurement system in Cementos del Norte S.A. The study is carried out as an improvement since the current measurement system is a bit obsolete and does not take the complete measurement of the plant. The main objective was to determine if the installation of a new energy measurement system for Cementos del Norte S.A. is technically and financially feasible. The hypothesis is: The installation of a new energy measurement system is feasible if the IRR is greater than the minimum IRR of 11% acceptable by Cementos del Norte S.A. for your projects. The methodology used is a quantitative method, with a non-experimental, transectional, descriptive study type, with a technical and financial study. The null hypothesis is rejected since according to the technical analysis and the analysis of the financial indicators where the IRR gives us 17%, the NPV $ 40,185.43 and the IR 1.17.
dc.formatPDF
dc.formatapplication/pdf
dc.languageEspañol
dc.languagees-HN
dc.publisherUniversidad Tecnológica Centroaméricana Unitec
dc.rightshttps://creativecommons.org/licenses/by-nc-nd/4.0/deed.es
dc.sourceUniversidad Tecnológica Centroaméricana UNITEC
dc.subjectSistema de Medición
dc.subjectEstudio Técnico
dc.subjectEstudio Financiero
dc.titlePrefactibilidad técnica y financiera para nuevo sistema de medición energético en Cementos Del Norte S.A. para año 2020 al 2021