dc.descriptionDurante el periodo de práctica profesional en la empresa UNO Honduras, se realizaron muchas actividades de apoyo, entre las que cabe mencionar la realización de los planos, presupuestos y parámetros de licitación para la ampliación de la oficina de mantenimiento, la realización del presupuesto y bases de licitación para el levantamiento topográfico de la terminal III (Asfaltos) la cualtiene planos sin medidas, siendo esta corrección el objetivo principal. Asimismo, se ayudóen la parte de la realización demedición, presupuesto, planos y bases de licitación para la mejora del muro perimetral ubicado en las oficinas administrativas de la empresa. También en la medición, realización de planos y de bases de licitación para la mejora estructural del soporte deltanque digestor #20 ubicado en la terminal III, así como para la construcción de un tanque gemelo con la finalidad de almacenar asfalto. El mayorapoyobrindado fue en la supervisión de la instalación del oleoducto que conduce del muelle 3 a la planta I, el cual conduce búnker, brindando ayudade supervisión por parte de la empresa UNO Honduras, al ingeniero supervisor contratado con diferentes actividades como realización de cronograma, redacción de informes, levantamiento topográfico, supervisión, etc.||During the period of professional practice in the company UNO Honduras, many support activities were performed, among which it is worth mentioning the realization of the plans, budgets and bidding parameters for the expansion of the maintenance office, the realization of the budget and bidding bases for the topographic survey of terminal III (Asphalt) which has plans without measurements, being this correction the main objective. Likewise, we helped in the measurement, budget, plans and bidding bases for the improvement of the perimeter wall located in the administrative offices of the company. Also in the measurement, preparation of plans and bidding documents for the structural improvement of the support of digester tank #20 located in terminal III, as well as for the construction of a twin tank for the storage of asphalt. The main support provided was in the supervision of the installation of the pipeline that leads from Pier 3 to Plant I, which leads to the bunker, providing supervisory assistance by the company UNO Honduras, to the supervising engineer hired with different activities such as making the schedule, drafting reports, topographic survey, supervision, etc.
dc.formatPDF
dc.formatapplication/pdf
dc.languageEspañol
dc.languagees-HN
dc.publisherUniversidad Tecnológica Centroaméricana UNITEC
dc.rightshttps://creativecommons.org/licenses/by-nc-nd/4.0/deed.es
dc.sourceUniversidad Tecnológica Centroaméricana UNITEC
dc.subjectPresupuesto||Topográfico||Muro
dc.titleInstalación de línea de tubería de oleoducto de muelle de cabotaje a terminal i búnker uno Honduras