info:eu-repo/semantics/article
ANALYSIS OF PROJECT AND OPERATION OF WASTEWATER TREATMENT PLANT IN CRAVINHOS, SP, BRAZIL
ANÁLISE DE PROJETO E OPERAÇÃO DE ESTAÇÃO DE TRATAMENTO DE ESGOTO EM CRAVINHOS (SP), BRASIL
Registro en:
10.5902/223611704375
Autor
Vieira, Elias Antonio
Institución
Resumen
http://dx.doi.org/10.5902/223611704375The present study deals with the procedure employed by the author in the evaluation ofa project to establish Wastewater Treatment Plant – WWTP in Cravinhos (SP). The method usedconsisted of a literature review and analysis of project documentation. The aim of this work is tosupport those interested in understanding the functioning of this type of project, as well ascontributing to the resolution of their faults. The results of this study indicated weaknesses andunconformities in the project in relation to the operation of the WWTP. http://dx.doi.org/10.5902/223611704375O presente estudo trata do procedimento empregado por seu autor na avaliação de um projeto de implantação de Estação de Tratamento de Esgoto - ETE em Cravinhos (SP). O método empregado constituiu-se de levantamento bibliográfico e da análise da documentação do projeto. O objetivo do trabalho é subsidiar os interessados no entendimento do funcionamento desse tipo de empreendimento, assim como contribuir com a resolução de suas eventuais falhas. Os resultados do presente estudo indicaram lacunas e ou inconformidades no projeto em relação ao funcionamento da ETE.