dc.contributorUniversidade Estadual Paulista (UNESP)
dc.creatorFerreira, Deisemara
dc.creatorMorabito, Reinaldo
dc.creatorRangel, Socorro
dc.date2014-05-20T15:31:31Z
dc.date2016-10-25T18:07:23Z
dc.date2014-05-20T15:31:31Z
dc.date2016-10-25T18:07:23Z
dc.date2009-07-16
dc.date.accessioned2017-04-06T00:22:38Z
dc.date.available2017-04-06T00:22:38Z
dc.identifierEuropean Journal of Operational Research. Amsterdam: Elsevier B.V., v. 196, n. 2, p. 697-706, 2009.
dc.identifier0377-2217
dc.identifierhttp://hdl.handle.net/11449/40634
dc.identifierhttp://acervodigital.unesp.br/handle/11449/40634
dc.identifier10.1016/j.ejor.2008.03.035
dc.identifierWOS:000263206800032
dc.identifierhttp://dx.doi.org/10.1016/j.ejor.2008.03.035
dc.identifier.urihttp://repositorioslatinoamericanos.uchile.cl/handle/2250/883390
dc.descriptionIn this paper we present a mixed integer programming model that integrates production lot sizing and scheduling decisions of beverage plants with sequence-dependent setup costs and times. The model considers that the industrial process produces soft drink bottles in different flavours and sizes, and it is carried out in two production stages: liquid preparation (stage I) and bottling (stage II). The model also takes into account that the production bottleneck may alternate between stages I and II, and a synchronisation of the production between these stages is required. A relaxation approach and several strategies of the relax-and-fix heuristic are proposed to solve the model. Computational tests with instances generated based on real data from a Brazilian soft drink plant are also presented. The results show that the solution approaches are capable of producing better solutions than those used by the company. (C) 2008 Elsevier B.V. All rights reserved.
dc.descriptionFundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
dc.descriptionConselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
dc.languageeng
dc.publisherElsevier B.V.
dc.relationEuropean Journal of Operational Research
dc.rightsinfo:eu-repo/semantics/closedAccess
dc.subjectLot sizing
dc.subjectScheduling
dc.subjectSoft drink industry
dc.subjectMixed integer programming
dc.subjectRelax-and-fix heuristic
dc.titleSolution approaches for the soft drink integrated production lot sizing and scheduling problem
dc.typeOtro


Este ítem pertenece a la siguiente institución