dc.contributor | Plaza Vera, Fernando Javier | |
dc.creator | Saltos Barzola, Jorge Andrés | |
dc.date | 2022-04-19T20:07:52Z | |
dc.date | 2022-04-19T20:07:52Z | |
dc.date | 2022-03-11 | |
dc.date.accessioned | 2023-08-11T17:03:59Z | |
dc.date.available | 2023-08-11T17:03:59Z | |
dc.identifier | http://repositorio.ucsg.edu.ec/handle/3317/18400 | |
dc.identifier.uri | https://repositorioslatinoamericanos.uchile.cl/handle/2250/8242693 | |
dc.description | El presente proyecto tiene como objetivo realizar un análisis acerca del
sistema pluvial del ramal B del Estero Salado luego de la instalación de una
estructura de regulación, con la finalidad de evitar los eventos de
inundaciones en la ciudad que ocurren frecuentemente durante la época
invernal. Para la realización se utilizó el programa SWMM (Storm Water
Management Model). Teniendo como base el Plan Maestro de Interagua. La
modelación consistió en esquematizar el sistema actual con sus debidas
condiciones y calcular los volúmenes de inundación con los periodos de
retorno de 2, 5, 10 y 25 años; posteriormente, se realizó la simulación con la
estructura implementada y conseguir los volúmenes de inundación bajo esta
condición, en la cual se tuvo como resultado que los mismos serían menores
gracias a la estructura implementada. Finalmente, se tiene que colectores
ante periodos de lluvias de dos horas, su funcionamiento es ahogado
llegando a un volumen de inundación de 72208.56 m3 bajo las condiciones
actuales, mientras que, al instalar las válvulas Pinch controla el ingreso del
agua por efecto de la marea evitando que estos colectores no funcionen de
manera ahogada y que el volumen de inundación disminuya a 55538.56 m3,
siendo este un 23% menor al volumen actual. | |
dc.description | The present project has as principal objective the analysis about pluvial
system from B branch of Estero Salado after the installation of regulation
structure trying to avoid the flooding events that usually happen on winter
season. For the process was necessary to use Storm Water Management
Model software having as a principal information “Plan maestro” by
Interagua. The simulation consist on modeling the actual pluvial system with
all its conditions and flooding volumes calculus for the period return of 2, 5,
10 and 25 years. Then, the regulation structure was added to the system and
get the new flooding volume having as a result that the collectors when the
raining period is more than 2 hours, they works as full capacity reaching to
72208.56 m3 of flooding volumes, meanwhile, the system set Pinch valves,
they both allow the right control of water from tide avoiding that the sumps
work at full capacity decreasing the flooding volume to 55538.56 m3, comparing with the another one, this is 23 % less. | |
dc.format | application/pdf | |
dc.language | spa | |
dc.publisher | Universidad Católica de Santiago de Guayaquil | |
dc.rights | info:eu-repo/semantics/openAccess | |
dc.rights | http://creativecommons.org/licenses/by-nc-sa/4.0/ | |
dc.subject | INGENIERÍA HIDRÁULICA | |
dc.subject | DRENAJE FLUVIAL | |
dc.subject | CONTROL DE INUNDACIONES | |
dc.subject | ALCANTARILLADO SANITARIO | |
dc.title | Análisis hidráulico sobre la implementación de una estructura de regulación del ramal B del estero Salado de Guayaquil para la reducción de los riesgos de inundación en su cuenca de drenaje. | |
dc.type | info:eu-repo/semantics/bachelorThesis | |