Parte de reporte/Report part
Challenge S4L Entregable 1 Etapa 1 - Actividad 5: Develop the first version (pilot) of the platform with industry 4.0 features
Fecha
2023-05-17Registro en:
Autor
Alcántar Nieblas, Carolina
Institución
Resumen
Challenge S4L Entregable 1 Etapa 1 de la Actividad 5: Develop the first version (pilot) of the platform with industry 4.0 features