bachelorThesis
Repotenciación del sistema de monitoreo y extracción de polvos en el área de corte de ladrillos refractarios en la empresa Samo Thermal
Fecha
2023-02Autor
Guamán Morocho, Byron Leonardo
Institución
Resumen
This Technical Project presents a proposal for the redesign of the localized ventilation system and the updating of the Andon system, implemented by the company Samo Thermal in the refractory brick cutting process, whose objective is to control and monitor dust concentration levels of crystalline silica and the operational status of the k-23 refractory brick cutting process.