dc.description.abstractEl objetivo principal por el cual se desarrollo el tema, es de disminuir las perdidas económicas que afectan a la constructora. Para la identificación de los problemas se ha utilizado dos herramientas de Ingeniería como es el diagrama Causa-Efecto y el de Pareto, ya que con la ayuda de estos diagramas hemos podido cuantificarlos y saber la incidencia económica que afecta. Entre los problemas más importantes que se ha encontrado son los siguientes: Reprocesos de productos de mala calidad. Retrasos de transporte de recursos Paralización de maquinas y equipos Para dar solución a los problemas se ha comparado las perdidas económicas actuales con la inversión que se va a realizar tomando en cuenta el tiempo en que se va recuperar la inversión. De lo antes enunciado se puede concluir que solucionando los problemas de mayor índice económico la constructora puede brindar productos de mejor calidad y entrega de los contratos en el menor tiempo posible. Se recomienda poner en practica las soluciones planteadas para así disminuir las perdidas económicas.
dc.description.abstractThe main objective for which the topic was developed is to reduce economic losses that affect the construction company. For the identification of the problems, two engineering tools have been used, such as the Cause-Effect diagram and the Pareto diagram, since with the help of these diagrams we have been able to quantify them and know the economic impact they affect. Among the most important problems that have been found are the following: Reprocessing of poor quality products. Resource Transport Delays Shutdown of machinery and equipment To solve the problems, the current economic losses have been compared with the investment to be made taking into account the time in which the investment will be recovered. From the foregoing, it can be concluded that solving the problems with the highest index economically, the construction company can provide better quality products and delivery of the contracts in the shortest possible time. It is recommended to put into practice the proposed solutions in order to reduce losses economic.
dc.languagespa
dc.publisherUniversidad de Guayaquil. Facultad de Ingeniería Industrial. Carrera de Ingeniería Industrial.
dc.relation;BINGI2706
dc.rightsopenAccess
dc.subjectGESTIÓN DE LA PRODUCCIÓN
dc.subjectDISMINUCIÓN DE REPROCESOS
dc.subjectRETRASOS EN PRODUCCIÓN
dc.subjectCONSTRUCCIÓN
dc.titleDisminución de reprocesos y retrasos en la ejecución de la producción en Constructora Ferrero Cía. Ltda.
dc.typeThesis