dc.contributorHurtado Paspuel, Jimmy Fernando
dc.creatorSuárez Camatón, George Flavio
dc.date.accessioned2019-07-22T18:34:11Z
dc.date.accessioned2023-03-09T15:10:35Z
dc.date.available2019-07-22T18:34:11Z
dc.date.available2023-03-09T15:10:35Z
dc.date.created2019-07-22T18:34:11Z
dc.date.issued2019-04-16
dc.identifierhttp://repositorio.ug.edu.ec/handle/redug/41734
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/6071684
dc.description.abstractEl presente trabajo describe la problemática del área de producción de telares de la empresa Sacos Durán REYSAC S.A, se plantea como objetivo mejorar el proceso de producción de sacos laminados y convencionales, mediante la caracterización de los diagramas de flujo del proceso y los estándares de productividad en el 2018 que es de 105.566.400 sacos/año, en base a registros se obtiene 126.854 horas de parada no programadas que generó un desperdicio de 612.307 sacos. Se diagnostica un costo por mermas de $ 73.476,84 teniendo una incidencia del 34% sobre el impacto económico que ascendió a $ 216.821,86, se propone reducir las mermas generadas mediante adquisición de maquinarias, instrumentos de control de calidad y capacitación, para el incremento de la productividad de la empresa con una inversión total de $ 111.953,95 obteniendo un TIR=31%, VAN= $ 82.827,12 y un PAYBACK= 1,9 años haciendo el proyecto rentable para la empresa.
dc.description.abstractThe present work describes the problematic of the area of production of looms of the company “Sacos Durán REYSAC SA.” The aim of this research is to improve the process of production of laminated and conventional sacks, by characterizing the flow diagrams of the process and productivity standards in 2018, which is 105,566,400 bags / year. Based on records, 126,854 non-scheduled stop hours were obtained, which generated a waste of 612,307 bags. A cost for losses of $ 73,476.84 is diagnosed, with an incidence of 34% on the economic impact that amounted to $ 216,821.86. It is proposed to reduce the losses generated through the acquisition of machinery, quality control instruments and training for the Increase of the productivity of the company with a total investment of $ 111,953.95 obtaining a IRR = 31%, NPV = $ 82,827.12 and a PAYBACK = 1.9 years making the project profitable for the company.
dc.languagespa
dc.publisherUniversidad de Guayaquil. Facultad de Ingeniería Industrial. Carrera de Ingeniería Industrial.
dc.relation;BINGI05314
dc.rightsopenAccess
dc.subjectSISTEMAS PRODUCTIVOS
dc.subjectSACOS LAMINADOS
dc.subjectSACOS DE POLIPROPILENO
dc.subjectTELARES
dc.titleMejoramiento del proceso de producción de sacos laminados y convencional del área de telares de una empresa en la ciudad de Guayaquil.
dc.typeThesis


Este ítem pertenece a la siguiente institución