dc.contributorRodrigues, Luiz Carlos de Abreu
dc.contributorMuniz, Sérgio Tadeu Gonçalves
dc.contributorRodrigues, Luiz Carlos de Abreu
dc.contributorMagatão, Leandro
dc.contributorLeite, Higor Vinícius dos Reis
dc.creatorGanzert, Allison Durigan
dc.date.accessioned2020-11-12T18:30:03Z
dc.date.accessioned2022-12-06T14:25:23Z
dc.date.available2020-11-12T18:30:03Z
dc.date.available2022-12-06T14:25:23Z
dc.date.created2020-11-12T18:30:03Z
dc.date.issued2013-05-07
dc.identifierGANZERT, Allison Durigan. Sequenciamento da produção (just-in-sequence) na linha de montagem final: estudo de caso em montadora da RMC. 2013. 77 f. Trabalho de Conclusão de Curso (Graduação) – Universidade Tecnológica Federal do Paraná, Curitiba, 2013.
dc.identifierhttp://repositorio.utfpr.edu.br/jspui/handle/1/10336
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/5248680
dc.description.abstractJust-In-Sequence is a manufacturing strategy that applies the Just-In-Time ideas in a more extreme level. It is employed mainly by the automobile manufacturers, because this industry is very competitive, has a relatively stable production and utilizes high added value components. This dissertation describes the Just-In-Sequence operation in two automakers located in the Metropolitan Region of Curitiba (RMC). It also presents computer simulations, utilizing the software Flexsim, of the Just-In-Sequence as well as the traditional Just-In-Time and the partially sequenced Just-In-Time, being applied in the operation of a part of the final assembly line of an automaker in the RMC. The simulations are compared to each other. Lastly, it is introduced a cost estimation method developed to analyze the economic impact of the shift from Just-In-Time to Just-In-Sequence in the supply of a given module (preassembled parts kit). The method was applied based on the data of an assembler in the RMC working in Just-In-Time. It was verified if the change to Just-In-Sequence can be advantageous.
dc.publisherUniversidade Tecnológica Federal do Paraná
dc.publisherCuritiba
dc.publisherBrasil
dc.publisherDepartamento Acadêmico de Mecânica
dc.publisherEngenharia Mecânica
dc.publisherUTFPR
dc.rightsopenAccess
dc.subjectMétodos de linha de montagem
dc.subjectIndústria automobilística
dc.subjectPlanejamento empresarial - Aplicações industriais
dc.subjectAssembly-line methods
dc.subjectAutomobile industry and trade
dc.subjectBusiness planning - Industrial applications
dc.titleSequenciamento da produção (just-in-sequence) na linha de montagem final: estudo de caso em montadora da RMC
dc.typebachelorThesis


Este ítem pertenece a la siguiente institución