Conference Paper
An artificial bee colony algorithm for the resource contrained project scheduling problem
Fecha
2015Registro en:
528, , 582-586
18650929
Autor
Crawford B.
Soto R.
Johnson F.
Norero E.
Olguín E.
Institución
Materias
Ítems relacionados
Mostrando ítems relacionados por Título, autor o materia.
-
A scheduling problem for software project solved with ABC metaheuristic
Crawford B.; Soto R.; Johnson F.; Vargas M.; Misra S.; Paredes F. (Springer Verlag, 2015) -
A Max-Min Ant System algorithm to solve the Software Project Scheduling Problem
Crawford B.; Soto R.; Johnson F.; Monfroy E.; Paredes F. (Elsevier Ltd, 2014) -
Ants can schedule software projects
Crawford B.; Soto R.; Johnson F.; Monfroy E. (Springer Verlag, 2013)