dc.contributorEspinoza Abad, Juan Leonardo
dc.contributorGonzález Morales, Luis Gerardo
dc.creatorAlvear Muevecela, Wilder Lenin
dc.date.accessioned2019-04-22T16:26:12Z
dc.date.accessioned2022-10-20T21:13:29Z
dc.date.available2019-04-22T16:26:12Z
dc.date.available2022-10-20T21:13:29Z
dc.date.created2019-04-22T16:26:12Z
dc.date.issued2019-04-22
dc.identifierhttp://dspace.ucuenca.edu.ec/handle/123456789/32467
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/4601850
dc.description.abstractIn the present project makes the design of low voltage electrical infrastructure of a loading station for an average fleet of 68 electric buses of the CONCUENCA consortium in city of Cuenca. The load infrastructure for the selected fleet consists 6 independent load centers, with the same characteristics, located in different sectors of city, each with a nominal power of 500 kVA and 6 charging stations or loaders. The load centers feeds from the medium voltage distribution network of the Centrosur Company, each of which has a medium voltage sectionalization center, a transformation center and a low voltage installation. The low voltage network feeds the chargers, which are responsible for satisfying energy demand of electric buses in the hours of the lowest, medium and highest consumption.
dc.languagespa
dc.relationTE;449
dc.subjectDiseño Electrico
dc.subjectCaida De Tension
dc.subjectPerdidas De Potencia
dc.subjectHorarios De Consumo
dc.subjectDemanda
dc.subjectMedia Tension
dc.subjectBaja Tension
dc.titleDiseño del sistema eléctrico en baja tensión para estaciones de carga de autobuses eléctricos
dc.typebachelorThesis


Este ítem pertenece a la siguiente institución