dc.contributorRojas Espinoza, Jorge Luis
dc.creatorPlaza Zumba, Edisson Israel
dc.creatorCoronel Coronel, Willian Mauricio
dc.date.accessioned2018-04-23T22:44:32Z
dc.date.accessioned2022-10-20T18:14:50Z
dc.date.available2018-04-23T22:44:32Z
dc.date.available2022-10-20T18:14:50Z
dc.date.created2018-04-23T22:44:32Z
dc.date.issued2017-12
dc.identifierhttps://dspace.ups.edu.ec/handle/123456789/15444
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/4572756
dc.description.abstractThe study carried out, was focused on the improvement of the steam production system, in the Thermoelectric plant El Descanso, optimizing the operation of the main cauldron, through preheat the feeding water of the same. The temperature of the feeding water will be increased by means of a coil that is located inside the daily tank.
dc.languagespa
dc.rightshttp://creativecommons.org/licenses/by-nc-nd/3.0/ec/
dc.rightsopenAccess
dc.rightsAtribución-NoComercial-SinDerivadas 3.0 Ecuador
dc.subjectINGENIERÍA ELÉCTRICA
dc.subjectRECURSOS ENERGÉTICOS RENOVABLES - ENERGÍA SOLAR
dc.subjectRADIACIÓN SOLAR
dc.subjectPRODUCCIÓN DE ENERGÍA ELÉCTRICA
dc.subjectCENTRALES TERMOELÉCTRICAS
dc.subjectCALDERAS
dc.subjectSERPENTÍN
dc.titleViabilidad de generación termo-solar para la central termoeléctrica El Descanso perteneciente a Electro Generadora del Austro ElecAustro S.A
dc.typebachelorThesis


Este ítem pertenece a la siguiente institución