bachelorThesis
Implementación del sistema de comunicación IEC 61850 para monitoreo y control del módulo de pruebas para el Laboratorio de Protecciones de la Universidad Politécnica Salesiana Sede Cuenca
Fecha
2021-12Autor
Torres Luna, Rodrigo Nikolas
Farez Jumbo, Oscar Jamil
Institución
Resumen
The purpose of the technical practical project is the implementation of the communication system based on the IEC 61850 standard, with the objective of comparing GOOSE messaging with conventional messaging, and a test manual was developed, which consists of the implementation of communication between IED's applying the IEC 61850 standard and GOOSE messaging.