dc.contributorIng. Lisandro Araya Rodríguez
dc.creatorSoto-Hernández, César Alonso
dc.date.accessioned2019-03-25T16:42:53Z
dc.date.accessioned2022-10-19T23:00:56Z
dc.date.available2019-03-25T16:42:53Z
dc.date.available2022-10-19T23:00:56Z
dc.date.created2019-03-25T16:42:53Z
dc.date.issued2018
dc.identifierhttps://hdl.handle.net/2238/10464
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/4514374
dc.description.abstractCurrently, the Costa Rican Electricity Institute (ICE), in the substations, provides auxiliary services corresponding to direct current (130 V) and alternating current (120/208 V). These auxiliary services were not previously charged among ICE's internal clients, but ICE is currently looking for efficiency and control of the business and of the areas expenses, which is why a collection methodology was established that meets this need, and it must also comply with the requirements of sectorial regulation on electrical services in chapter 4, article 22 of the ARESEP. This methodology covers only the La Garita electrical substation, which by applying the collection methodology for direct current auxiliary services, it was possible to identify that the beneficiaries and their associated costs correspond to 6% Cence, 8% Generation Business, 11% Transmission Business, 16% Communication Area, 23% Chucás, 36% Distribution Business, the costs represent around ₡ 3,800,000.00 monthly and ₡ 45,000,000.00 annually. In addition to the collection methodology for auxiliary services alternating current , the following results obtained as beneficiaries and costs refer, 14% to the Operations Area, 21% to the Civil Area, 22% to the Direct Current Area and 43% to the high voltage area, which represents a cost total of around ₡ 2,200,000.00 monthly and ₡ 27,000,000.00 annually.
dc.languagespa
dc.publisherInstituto Tecnológico de Costa Rica
dc.subjectCostos
dc.subjectServicios
dc.subjectMetodología
dc.subjectCobros
dc.subjectClientes
dc.subjectBeneficiarios
dc.subjectResearch Subject Categories::TECHNOLOGY::Engineering mechanics
dc.titleMetodología de cobro para los servicios auxiliares brindados por la subestación Garita
dc.typelicentiateThesis


Este ítem pertenece a la siguiente institución