Práctica profesional como auxiliar de interventoría en la construcción del hospital local de Tunja
Fecha
2019-11-28Registro en:
Cárdenas García, D.F. (2019). Práctica profesional como auxiliar de interventoría en la construcción del hospital local de Tunja. Tesis de pregrado. Universidad Santo Tomás. Tunja.
Autor
Cárdenas García, Dayana Fernanda
Institución
Resumen
The Owner´s Representative Role or Interventory, is a primary controlling, monitoring and verifying tool for aspects such as administrative, technical, financial, legal and environmental control that guarantees the quality at each stage of the execution of any construction project, which is required in all public contracts.
This tool includes a careful supervision of quantities, construction processes, valuation of the materials, staff experience, machinery, adequate disposal of solid waste and other aspects that are part of the rigorous processes of control that must be carried out on site. Its main objective is to ensure compliance with the contract terms including qualities, quantities and adequate invest of contract resources, avoiding inconsistencies in the structure in the short or long term, that attempt against the welfare and satisfaction of users.
The construction project of Tunja Hospital Local, was born due to the need to attend and assist medically the population of Department de Boyacá capital’s city and its surroundings, which is constantly growing, and also the lack of basic health services in several of the surrounding municipalities.
In operation, the Tunja Local Hospital will provide health services of a second level of complexity, achieving decongest San Rafael Hospital.