dc.contributorRodríguez Sánchez, Juan Pablo
dc.contributorDíaz-Granados Ortíz, Mario A.
dc.contributorMancipe Muñoz, Néstor Alonso
dc.creatorRamírez Cely, Paula Marcela
dc.date.accessioned2020-06-10T09:18:20Z
dc.date.available2020-06-10T09:18:20Z
dc.date.created2020-06-10T09:18:20Z
dc.date.issued2018
dc.identifierhttp://hdl.handle.net/1992/34722
dc.identifierinstname:Universidad de los Andes
dc.identifierreponame:Repositorio Institucional Séneca
dc.identifierrepourl:https://repositorio.uniandes.edu.co/
dc.description.abstractEl enfoque de este proyecto corresponde a la evaluación del desempeño del piloto de Sistemas Urbanos de Drenaje Sostenible (SUDS), construido en el Parque Metropolitano San Cristóbal Sur. El tren de tratamiento se compone por una Cuneta Verde y una Cuenca Seca de Drenaje Extendido (CSDE), implementadas para promover procesos de detención, captura de partículas sólidas e infiltración de escorrentía pluvial. Para lograr el objetivo, se monitoreó el tren de tratamiento durante la segunda temporada invernal del año 2017, (entre 8 de noviembre y 15 de diciembre), y durante la primera temporada de lluvias de 2018. Luego se estimaron las reducciones de caudal pico, volúmenes de escorrentía y remoción de contaminantes. Además, se implementó y calibró un modelo en WinSLAMM, con el fin de evaluar el desempeño del piloto en cada tipología y establecer los factores que afectan la remoción de contaminantes particulados. Los registros de caudales indicaron que todos los eventos...
dc.description.abstractThe focus of this project corresponds to the evaluation of the performance of the pilot of Sustainable Urban Drainage Systems (SUDS), built in the Metropolitan Park San Cristóbal Sur. The treatment train consists of a grass swale and a Dry Extended Detention Basin (DEDB), implemented to promote processes of detention, capture of solid particles and infiltration of stormwater runoff. To achieve the objective, the treatment train was monitored during the second winter season of 2017, (between November 8 and December 15), and during the first rainy season of 2018. Then the peak flow reductions, runoff volumes and removal of pollutants were estimated, . In addition, a model was implemented and calibrated in WinSLAMM, in order to evaluate the performance of the pilot in each type and establish the factors that affect the removal of particulate contaminants. The flow records indicated that all the events analyzed showed positive reductions in peak flows...
dc.languagespa
dc.publisherUniandes
dc.publisherMaestría en Ingeniería Ambiental
dc.publisherFacultad de Ingeniería
dc.publisherDepartamento de Ingeniería Civil y Ambiental
dc.rightsAl consultar y hacer uso de este recurso, está aceptando las condiciones de uso establecidas por los autores.
dc.rightshttps://repositorio.uniandes.edu.co/static/pdf/aceptacion_uso_es.pdf
dc.rightsinfo:eu-repo/semantics/openAccess
dc.rightshttp://purl.org/coar/access_right/c_abf2
dc.sourceinstname:Universidad de los Andes
dc.sourcereponame:Repositorio Institucional Séneca
dc.titleEvaluación del desempeño de sistemas urbanos de drenaje sostenible : caso de estudio Parque Metropolitano San Cristóbal Sur
dc.typeTrabajo de grado - Maestría


Este ítem pertenece a la siguiente institución