info:eu-repo/semantics/article
A CP Approach to the Scheduling of Resource-Constrained Multiproduct Continuous Facilities
Date
2006-06Registration in:
Zeballos, Luis Javier; Henning, Gabriela Patricia; A CP Approach to the Scheduling of Resource-Constrained Multiproduct Continuous Facilities; Planta Piloto de Ingeniería Química; Latin American Applied Research; 36; 4; 6-2006; 205-212
0327-0793
1851-8796
CONICET Digital
CONICET
Author
Zeballos, Luis Javier
Henning, Gabriela Patricia
Abstract
This contribution presents a new Constraint Programming (CP) formulation to address the optimal operation of multiproduct continuous processes. In particular, facilities having continuous stages, which manufacture intermediate or final products and a limited number of intermediate storage tanks, are tackled. The problem involves finding (i) the optimal sequence of production runs and (ii) the optimal agenda of usage of each storage tank. The proposed formulation is able to handle different features found in industrial environments such as dissimilar machines, sequence-dependent changeover times, forbidden campaign-machine assignments, production runs´ length constraints, etc. Moreover, one of the main contributions of this paper is the handling of constrained resources of various types, such as intermediate storage tanks of limited capacity and qualified manpower required at some stages.