Artículos de revistas
Recovery of p-TBC from a butadiene washing stream in a pilot plant
Fecha
2009Registro en:
Brazilian Journal of Chemical Engineering, v.26, n.4, p.635-640, 2009
0104-6632
10.1590/S0104-66322009000400001
Autor
LÓSS, C. F.
AZEVEDO, E. B.
DEZOTTI, M.
Institución
Resumen
Results obtained in a pilot-scale unit designed for COD removal and p-TBC (p-tert-butylcatechol) recovery from a butadiene washing stream (pH 14, 200,000 mg COD L-1, highly toxic) at a petrochemical industry are presented. By adding H3PO4, phase separation is achieved and p-TBC is successfully recovered (88 g L-1 of washing stream). Information (time for phase separation and organic phase characterization) was gathered for designing a future industrial unit. The estimated heat generation rate was 990 kJ min-1 and 15 min were enough to promote phase separation for a liquid column of approximately 1.15 m.