This document contains the design of a System of
Quality Control and Inspection in the Construction
of Electrical Substations for the Instituto
Costarricense de Electricidad, especially for
Strategic Business Unit Transmission of
Electricity in its Expansion Process Network (UEN
TE). The main objective of this work is to update
and improve existing construction specifications
and undertake the design of a system of quality
control and inspection for the construction of
electrical substations.
In order to achieve the stated objective, a series
of interviews to engineering professionals were
carried out, as well as field visits to the electricity
substations throughout the country. This becomes
the main source of information.
As a result of this work, the System of Quality
Control and Inspection in the Construction of
Electrical Substations was obtained, which
consists of a series of documents such as
Electrical Substations Construction
Requirements, Aspects of Building Design of
Electrical Substations and checklist for Building
Electrical Substations.
With the design of System of Quality Control and
Inspection it is ensured that the UEN TE has the
necessary tools to control the quality of its
electrical projects.