Scatter search for project scheduling with resource availability cost
Registro en:
European Journal Of Operational Research. Elsevier Science Bv, v. 169, n. 2, n. 623, n. 637, 2006.
0377-2217
WOS:000232583700017
10.1016/j.ejor.2004.08.019
Autor
Yamashita, DS
Armentano, VA
Laguna, M
Institución
Resumen
This paper considers a project scheduling problem with the objective of minimizing resource availability costs, taking into account a deadline for the project and precedence relations among the activities. Exact methods have been proposed for solving this problem, but we are not aware of existing heuristic methods. Scatter search is used to tackle this problem, and our implementation incorporates advanced strategies such as dynamic updating of the reference set, the use of frequency-based memory within the diversification generator, and a combination method based on path relinking. We also analyze the merit of employing a subset of different types when combining solutions. Extensive computational experiments involving more than 2400 instances are performed. For small instances, the performance of the proposed procedure is compared to optimal solutions generated by an exact cutting plane algorithm and upper and lower bounds from the literature. For medium and larger size instances, we developed simple multi-start heuristics and comparative results are reported. (c) 2004 Elsevier B.V. All rights reserved. 169 2 623 637