Tesis
Diseño de un plan de administración ambiental para la Empresa porcícola Reina del Cisne
Fecha
2017-01-31Registro en:
Romero Loayza, Jairo Alexander. (2017). Diseño de un plan de administración ambiental para la Empresa porcícola Reina del Cisne. Escuela Superior Politécnica de Chimborazo. Riobamba.
Autor
Romero Loayza, Jairo Alexander
Resumen
In the farm “Reina del Cisne” located in canton Piñas an environmental administration plan in which were verified its environmental conditions assessing samples of solid and liquid waste using descriptive statistic giving as a result that he generated impacts are basically about with the sewage water which are deposited in different places near the farm and their waste goes to the rivers without previous treatment. At the moment of the analysis we could observe that the farm has knowledge about environmental theme nevertheless we found that exist certain impacts that, if they are not strictly controlled, they would become in an infection focus for the area, the water waste present changes in their constitution, because of comparing the results of the analysis of un/out water, we noticed an increase in its compositions, nevertheless when we related this whit the environmental regulations of our country (TULDAS), we can see that these do not exceed the permitted limits. Nevertheless the qualification obtained by the farm is – 23, which indicates that the impact is negative, it means that the activities developed by the enterprise degrades the conditions of the environment, however, this s impact is assimilated by the ecosystem and the modifications generated by the pig farm are not permanent and it does not represent an environmental problem of high impact.