dc.contributorSexto Cabrera, Luis Felipe
dc.contributorFreire Miranda, Jorge
dc.contributorAstudillo Machuca, Cesar
dc.creatorBenítez Santillán, Iván Leonardo
dc.date.accessioned2016-02-12T15:01:33Z
dc.date.available2016-02-12T15:01:33Z
dc.date.created2016-02-12T15:01:33Z
dc.date.issued2015-12
dc.identifierBenítez Santillán, Iván Leonardo. (2016). Propuesta de mejoramiento de los planes de mantenimiento de los equipos criticos de generacion electrica de la Central de Produccion y Facilidades (CPF), utilizando (RCM), en el Bloque 15 de Petroamazonas. Escuela Superior Politécnica de Chimborazo. Riobamba.
dc.identifierhttp://dspace.espoch.edu.ec/handle/123456789/4474
dc.description.abstractOil production in Indillana block 15 in Petroamazonas, i mplemented critical equipment mai ntenance plans t o generate electrical in the production and facilities plant (CPF), by applying the reliability centered maint enance methodology (RCM). The RCM analyzes the function of each element to determine if it is under initial conditions of, or if has lost performance; the purpose is to establish the failure modes or damage cause and determine t he effect, in order t o obtain or optimize the maintenance plans in critical elements of an asset. The four power generation systems were analyzed. The obtained critical assets have presented different flaws i n the operating ti me. Even though the frequency in t he maj orit y of the equipment has been classi fied as "Remote", it is important to know the starting point in terms of maintenance indicators. The redundancy of elements within the Power Generation System is evident, the mai n cause for the obtained qualifications according to the consequences analysis are indicators which show that the s ystem has a good reliability. Based on the results, additional tasks are determinate to be taken int o account for future maintenance of these units considered as critical i n t he PAM and CPF operations. The developed guides and protocols contributes to the inexistence of confusi on i n emergency situations facing with sudden non-planned stops in four di fferent scenarios. It is recommended t o use this technique in all the operation equipment used to obtai n oil.
dc.languagespa
dc.publisherEscuela Superior Politécnica de Chimborazo
dc.relationUDCTIPEC;20T00664
dc.rightshttps://creativecommons.org.//licenses/by-nc-sa/3.0/ec/
dc.rightsinfo:eu-repo/semantics/openAccess
dc.subjectRCM MANTENIMIENTO BASADO EN CONFIABILIDAD
dc.subjectSISTEMAS DE GENERACION
dc.subjectMOTORES DE COMBUSTION INTERNA
dc.subjectPETROAMAZONAS EP
dc.subjectPF CENTRAL DE PRODUCCION Y FACILIDADES
dc.subjectSUCUMBIOS (PROVINCIA)
dc.titlePropuesta de mejoramiento de los planes de mantenimiento de los equipos criticos de generacion electrica de la Central de Produccion y Facilidades (CPF), utilizando (RCM), en el Bloque 15 de Petroamazonas
dc.typeTesis


Este ítem pertenece a la siguiente institución