Buscar
Mostrando ítems 31-40 de 1803
Integrated planning and scheduling with due dates in corrugated board boxes industry
(American Chemical Society, 2013-01)
An integrated approach that solves the cutting stock problem and scheduling is considered in this article. The main challenging characteristics of this problem are given by its combinatorial nature, as well as the ...
A Novel Network-based Continuous-Time Representation for Process Scheduling: Part II. General Framework
(Elsevier, 2009-12)
In the first part of this series of paperswe presented a newnetwork-based continuous-time representation for the short-term scheduling of batch processes, which overcomes numerous shortcomings of existing approaches. In ...
Efficient Tool for the Scheduling of Multiproduct Pipelines and Terminal Operations
(American Chemical Society, 2008-12)
This paper addresses the problem of scheduling a transmission pipeline carrying several petroleum products from a single oil refinery to a unique distribution center over a monthly horizon. The proposed approach is based ...
A monolithic approach to vehicle routing and operations scheduling of a cross-dock system with multiple dock doors
(Elsevier, 2014-01)
Cross-docking is a logistic strategy for moving goods from suppliers to customers via a cross-dock terminal with no permanent storage. The operational planning of a cross-dock facility involves different issues such as ...
Scheduler for IEEE 802.16 networks
(Ieee-inst Electrical Electronics Engineers IncPiscatawayEUA, 2008)
Vehicle and crew scheduling for urban bus lines
(Elsevier Science BvAmsterdamHolanda, 2006)
An iterative cell scheduling algorithm for ATM input-queued switch with service class priority
(Ieee-inst Electrical Electronics Engineers IncNew YorkEUA, 1999)
Phase planning today
(Pontificia Universidad Católica de Chile. Departamento de Ingeniería y Gestión de la Construcción, 2007)
Heuristic methods for the single machine scheduling problem with different ready times and a common due date
(TAYLOR & FRANCIS LTDABINGDON, 2012)
The single machine scheduling problem with a common due date and non-identical ready times for the jobs is examined in this work. Performance is measured by the minimization of the weighted sum of earliness and tardiness ...