Search
Now showing items 1-10 of 154
Production lot sizing and scheduling with non-triangular sequence-dependent setup times
(Taylor & Francis Ltd, 2014-04-18)
This paper considers a production lot sizing and scheduling problem with sequence-dependent setup times that are not triangular. Consider, for example, a product that contaminates some other product unless either a ...
Production lot sizing and scheduling with non-triangular sequence-dependent setup times
(Taylor & Francis Ltd, 2014)
Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups
(Springer, 2007-08-01)
A lot sizing and scheduling problem from a foundry is considered in which key materials are produced and then transformed into many products on a single machine. A mixed integer programming (MIP) model is developed, taking ...
Production lot sizing and scheduling with non-triangular sequence-dependent setup times
(Taylor & Francis Ltd, 2014)
Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups
(Springer, 2007-08-01)
A lot sizing and scheduling problem from a foundry is considered in which key materials are produced and then transformed into many products on a single machine. A mixed integer programming (MIP) model is developed, taking ...
Métodos heurísticos construtivos para redução do estoque em processo em ambientes de produção flow shop híbridos com tempos de setup dependentes da sequência
(Universidade Federal de São Carlos, 2010)
Este artigo apresenta uma investigação sobre o problema de programação da produção em ambientes flow shop com múltiplas máquinas (híbridos) e tempos de preparação (setup) das máquinas assimétricos e dependentes da sequência, ...
Scheduling wine bottling operations with multiple lines and sequence-dependent set-up times: Robust formulation and a decomposition solution approach
(Elsevier B.V., 2022)
© 2022 Elsevier B.V.Planning and scheduling the multiple bottling lines of large wineries can significantly increase or reduce their inventory cost and bottling lines operating costs. It also determines how well they meet ...
A Hybrid Algorithm to Minimize Regular Criteria in the Job-shop Scheduling Problem with Maintenance Activities, Sequence Dependent and Set-up Times
(Communications in Computer and Information Science, 2020)