Production lot sizing and scheduling with non-triangular sequence-dependent setup times
(Taylor & Francis Ltd, 2014-04-18)
This paper considers a production lot sizing and scheduling problem with sequence-dependent setup times that are not triangular. Consider, for example, a product that contaminates some other product unless either a ...
Production lot sizing and scheduling with non-triangular sequence-dependent setup times
(Taylor & Francis Ltd, 2014)
Production lot sizing and scheduling with non-triangular sequence-dependent setup times
(Taylor & Francis Ltd, 2014)
Abordagens para resolver o problema integrado de dimensionamento de lotes e scheduling em máquinas paralelas
(Universidade Federal de São Paulo (UNIFESP), 2019-02-25)
This study approaches the integrated lot sizing and scheduling problem (ILSSP), in which non-identical machines work in parallel with sequence-dependent non-triangular (NT) setup costs and times, setup carr y-over and ...
Stability of a permeable obstacle against the impact of a water flow
(Universidad de los AndesMaestría en Ingeniería CivilFacultad de IngenieríaDepartamento de Ingeniería Civil y Ambiental, 2022-06-17)
Baffle mitigation structures can be built from permeable obstacles with non-fixed bases, leaving the question of how easy it is for these structures to slide. In this master thesis, we study the stability of permeable ...
Fases cuánticas de mezclas de átomos bosónicos y fermiónicos en una dimensión
(Bogotá - Ciencias - Doctorado en Ciencias - FísicaDepartamento de FísicaUniversidad Nacional de Colombia - Sede Bogotá, 2020-07-08)
Las mezclas de partículas que satisfacen diferentes estadísticas han sucitado gran interes tanto teórico como experimental en la últimas decadas, debido a la posibilidad de confinar y manipular gases cuánticos en redes ...