Buscar
Mostrando ítems 1-10 de 19962
La evaluación del desarrolloAssessment of Development
(Pontificia Universidad Católica del Perú. Fondo EditorialPE, 2017)
Marshall parameters for quality control of hot mix asphalt after pavement construction
(2019)
© 2019 Pontificia Universidad Catolica de Chile, Escuela de Construccion Civil. Highways have been and are built using Hot Mix Asphalt (HMA) as surface layer. The most common HMA design procedure is the Marshall Method, a ...
Sleep duration and fatigue in construction workers: A preliminary study
(2021)
The construction industry is known for its high rate of accidents. Among the different possible causes of this situation, we could find lack of sleep and fatigue. Chronic sleep deprivation is a determining factor in the ...
Identification of steel bars immersed in reinforced concrete based on experimental results of eddy current testing and artificial neural network analysis
(2013-03-01)
This paper presents an experimental research on the use of eddy current testing (ECT) and artificial neural networks (ANNs) in order to identify the gauge and position of steel bars immersed in concrete structures. The ...
Identification of steel bars immersed in reinforced concrete based on experimental results of eddy current testing and artificial neural network analysis
(2013-03-01)
This paper presents an experimental research on the use of eddy current testing (ECT) and artificial neural networks (ANNs) in order to identify the gauge and position of steel bars immersed in concrete structures. The ...
Construction time, cost and testing data of a prefabricated isolation medical unit for COVID-19
Coronavirus Disease 2019 (COVID-19) has been identified as
a global pandemic by the World Health Organization (WHO).
The breakout of COVID-19 in various countries and regions
brings a great threat to people’s life and ...
Scale of Coping with Pain for Dancers (COPAIN-Dancer): Construction and validity evidencesEscala de afrontamiento del dolor para bailarines (COPAIN-Dancer): Construcción y evidencias de validezÉchelle d’Adaptation à la Douleur pour les Danseurs (COPAIN-Dancer): Preuves de construction et de validitéEscala de Coping da Dor para Bailarinos (COPAIN-Dancer): Construção e evidências de validade
(Pontificia Universidad Católica del Perú, 2018)
Development and construction of a specific chamber for phototoxicity test
(Sao Paulo: ABEN, 2013, 2014)
Sleep duration and results of the psychomotor vigilance test in construction workers: a preliminary study
(2020)
The construction industry is known by its high rate of accidents. Among the different possible causes of this situation we could find lack of sleep and fatigue. Chronic sleep deprivation is a determining factor in the ...