Search
Now showing items 1-10 of 6712
Monitoring system for an experimental facility using GMDH methodology
(Associa????o Brasileira de Energia Nuclear, 2018)
Technical and economic feasibility study for the reactivation of the integral test facility of IPEN/CNEN Nuclear Engineering Center
(Associa????o Brasileira de Energia Nuclear, 2018)
BISTFaSC: an aproach to embed structural testing facilities into software components
(Universidade de BrasíliaSociedade Brasileira de ComputaçãoBrasília, 2013)
Component-based applications can be composed by in-house or COTS (Commercial off-the-shelf) components. In many situations, reused components should be tested before their integration into an operational environment. Testing ...
Fractional scaling analysis apllied to scale a pressurizer test facility
(Sao Paulo: ABEN, 2007, 2014)
Two-level network design with intermediate facilities: An application to electrical distribution systems
(PERGAMON-ELSEVIER SCIENCE LTD, 2011)
We consider the two-level network design problem with intermediate facilities. This problem consists of designing a minimum cost network respecting some requirements, usually described in terms of the network topology or ...
Two-level network design with intermediate facilities: An application to electrical distribution systems
(2011-01-01)
We consider the two-level network design problem with intermediate facilities. This problem consists of designing a minimum cost network respecting some requirements, usually described in terms of the network topology or ...
Two-level network design with intermediate facilities: An application to electrical distribution systems
(2011-01-01)
We consider the two-level network design problem with intermediate facilities. This problem consists of designing a minimum cost network respecting some requirements, usually described in terms of the network topology or ...