Models for capacitated lot-sizing problem with backlogging, setup carryover and crossover
(Palgrave MacmillanLondon, 2013)
Setup operations are significant in some production environments. It is mandatory that their production plans
consider some features, as setup state conservation across periods through setup carryover and crossover. ...
Production lot sizing and scheduling with non-triangular sequence-dependent setup times
(Taylor & Francis Ltd, 2014-04-18)
This paper considers a production lot sizing and scheduling problem with sequence-dependent setup times that are not triangular. Consider, for example, a product that contaminates some other product unless either a ...
Impact analysis of setup carryover and crossover on lot sizing problems
(2019-01-01)
This paper presents a literature classification and a detailed computational study analysing the impact of considering the possibility of setup carryover and crossover when solving the lot sizing problem. This problem is ...
Heuristic for flow shop sequencing with separated and sequence independent setup times
(Associação Brasileira de Engenharia e Ciências Mecânicas - ABCM, 2011)
This paper deals with the permutation flow shop scheduling problem with separated and sequence-independent machine setup times. A heuristic method with the objective of minimizing the total time to complete the schedule ...
Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups
(Springer, 2007-08-01)
A lot sizing and scheduling problem from a foundry is considered in which key materials are produced and then transformed into many products on a single machine. A mixed integer programming (MIP) model is developed, taking ...
Métodos heurísticos construtivos para redução do estoque em processo em ambientes de produção flow shop híbridos com tempos de setup dependentes da sequência
(Universidade Federal de São Carlos, 2010)
Este artigo apresenta uma investigação sobre o problema de programação da produção em ambientes flow shop com múltiplas máquinas (híbridos) e tempos de preparação (setup) das máquinas assimétricos e dependentes da sequência, ...
An analysis of formulations for the capacitated lot sizing problem with setup crossover
(Elsevier B.V., 2017-04-01)
The lot sizing problem with setup crossover is an extension of the standard big bucket capacitated lot sizing problem (CLSP). The general idea is that the first setup operation of each planning period can already start in ...
A genetic algorithm for the one-dimensional cutting stock problem with setups
(Sociedade Brasileira de Pesquisa Operacional, 2014-05-01)
This paper investigates the one-dimensional cutting stock problem considering two conflicting objective functions: minimization of both the number of objects and the number of different cutting patterns used. A new heuristic ...
Minimizing total tardiness in parallel machine scheduling with setup times: An adaptive memory-based GRASP approach
(Elsevier Science BvAmsterdamHolanda, 2007)
Metodologia de Shigeo Shingo (SMED): análise crítica e estudo de casoShingo ´s methodology (SMED): critical evaluation and case study