Buscar
Mostrando ítems 1-10 de 1606
Decentralized AC power flow for real-time multi-TSO power system operation
(2010-12-06)
This paper adjusts decentralized OPF optimization to the AC power flow problem in power systems with interconnected areas operated by diferent transmission system operators (TSO). The proposed methodology allows finding ...
Decentralized AC power flow for real-time multi-TSO power system operation
(2010-12-06)
This paper adjusts decentralized OPF optimization to the AC power flow problem in power systems with interconnected areas operated by diferent transmission system operators (TSO). The proposed methodology allows finding ...
Decentralized AC power flow for real-time multi-TSO power system operation
(Ieee, 2010-01-01)
This paper adjusts decentralized OPF optimization to the AC power flow problem in power systems with interconnected areas operated by diferent transmission system operators (TSO). The proposed methodology allows finding ...
A novel approach for Modeling the steady-state VSC-based multiline FACTS controllers and their operational constraints
(IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC, 2008)
A new, simple approach for modeling and assessing the operation and response of the multiline voltage-source controller (VSC)-based flexible ac transmission system controllers, namely the generalized interline power-flow ...
Optimal Power Flow with Voltage-Sensitive Loads in Distribution Networks
(Ieee, 2016-01-01)
Traditionally, the optimal power flow (OPF) assumes a constant (active and reactive) power load model and thus it neglects the effect of the voltage sensitiveness of power load injections. As a consequence, the results ...
Reliability assessment of energy limited systems using sequential montecarlo simulation
(2006-12-01)
This paper explains why the reliability assessment of energy limited systems requires more detailed models for primary generating resources availability, internal and external generating dispatch and customer demand than ...
Reliability assessment of energy limited systems using sequential montecarlo simulation
(2006-12-01)
This paper explains why the reliability assessment of energy limited systems requires more detailed models for primary generating resources availability, internal and external generating dispatch and customer demand than ...
HOW TO EFFICIEN TLY INCORPORATE FACTS DEVICES IN OPTIMAL ACTIVE POWER FLOW MODEL
(Amer Inst Mathematical Sciences, 2010-05-01)
This paper presents for the first time how to easily incorporate facts devices in an optimal active power flow model such that an efficient interior-point method may be applied. The optimal active power flow model is based ...