Search
Now showing items 1-10 of 56
Strategies to model scheduling decisions to plan the soft drink production process
(2012-06-13)
In this paper we present a mixed integer model that integrates lot sizing and lot scheduling decisions for the production planning of a soft drink company. The main contribution of the paper is to present a model that ...
Relax and fix heuristics to solve one-stage one-machine lot-scheduling models for small-scale soft drink plants
(Pergamon-Elsevier B.V. Ltd, 2010-04-01)
The production planning of regional small-scale soft drink plants can be modeled by mixed integer models that integrate lot sizing and scheduling decisions and consider sequence-dependent setup times and costs. These plants ...
Tabu search to solve the Synchronized and Integrated Two-Level Lot Sizing and Scheduling Problem
(2011-08-24)
This paper proposes a tabu search approach to solve the Synchronized and Integrated Two-Level Lot Sizing and Scheduling Problem (SITLSP). It is a real-world problem, often found in soft drink companies, where the production ...
Relax and fix heuristics to solve one-stage one-machine lot-scheduling models for small-scale soft drink plants
(Pergamon-Elsevier B.V. Ltd, 2014)
Meta-heuristic approaches for a soft drink industry problem
(2008-11-24)
The present paper evaluates meta-heuristic approaches to solve a soft drink industry problem. This problem is motivated by a real situation found in soft drink companies, where the lot sizing and scheduling of raw materials ...
Heuristics and meta-heuristics for lot sizing and scheduling in the soft drinks industry: A comparison study
(2008-09-04)
This chapter studies a two-level production planning problem where, on each level, a lot sizing and scheduling problem with parallel machines, capacity constraints and sequence-dependent setup costs and times must be solved. ...
Solution approaches for the soft drink integrated production lot sizing and scheduling problem
(Elsevier B.V., 2009-07-16)
In this paper we present a mixed integer programming model that integrates production lot sizing and scheduling decisions of beverage plants with sequence-dependent setup costs and times. The model considers that the ...