Buscar
Mostrando ítems 1-10 de 2571
An artificial bee colony algorithm for the resource contrained project scheduling problem
(Springer Verlag, 2015)
Firefly algorithm to solve a project scheduling problem
(Springer Verlag, 2016)
Strategies to model scheduling decisions to plan the soft drink production process
(2012-06-13)
In this paper we present a mixed integer model that integrates lot sizing and lot scheduling decisions for the production planning of a soft drink company. The main contribution of the paper is to present a model that ...
A Max-Min Ant System algorithm to solve the Software Project Scheduling Problem
(Elsevier Ltd, 2014)
A scheduling problem for software project solved with ABC metaheuristic
(Springer Verlag, 2015)
Ants can schedule software projects
(Springer Verlag, 2013)
Mathematical model and solution approaches for integrated lot-sizing, scheduling and cutting stock problems
(Springer, 2020-09-04)
In this paper, we address a two-stage integrated lot-sizing, scheduling and cutting stock problem with sequence-dependent setup times and setup costs. In production stage one, a cutting machine is used to cut large objects ...
The use of metaheuristics to software project scheduling problem
(Springer Verlag, 2014)
An alternative solution to the software project scheduling problem
(Springer Verlag, 2016)