Strategies to model scheduling decisions to plan the soft drink production process
(2012-06-13)
In this paper we present a mixed integer model that integrates lot sizing and lot scheduling decisions for the production planning of a soft drink company. The main contribution of the paper is to present a model that ...
Lot sizing and furnace scheduling in small foundries
(2008-03-01)
A lot sizing and scheduling problem prevalent in small market-driven foundries is studied. There are two related decision levels: (1) the furnace scheduling of metal alloy production, and (2) moulding machine planning which ...
A priori reformulations for joint rolling-horizon scheduling of materials processing and lot-sizing problem
(2013-06-10)
In many production processes, a key material is prepared and then transformed into different final products. The lot sizing decisions concern not only the production of final products, but also that of material preparation ...
Evaluating genetic algorithms with different population structures on a lot sizing and scheduling problem
(2008-12-01)
This paper studies the use of different population structures in a Genetic Algorithm (GA) applied to lot sizing and scheduling problems. The population approaches are divided into two types: single-population and ...
Lot sizing and furnace scheduling in small foundries
(PERGAMON-ELSEVIER SCIENCE LTD, 2008)
A lot sizing and scheduling problem prevalent in small market-driven foundries is studied. There are two related decision levels: (I the furnace scheduling of metal alloy production, and (2) moulding machine planning which ...
Production lot sizing and scheduling with non-triangular sequence-dependent setup times
(Taylor & Francis Ltd, 2014-04-18)
This paper considers a production lot sizing and scheduling problem with sequence-dependent setup times that are not triangular. Consider, for example, a product that contaminates some other product unless either a ...
A non-permutation flowshop scheduling problem with lot streaming: A mathematical model
(Growing Science, 2016-06)
In this paper we investigate the use of lot streaming in non-permutation flowshop scheduling problems. The objective is to minimize the makespan subject to the standard flowshop constraints, but where it is now permitted ...